DREDGE POND
REALIGNMENT PROJECT

Dredge Pond Realignment Project

Photos of Dredge Ponds October 2023

Narrated Video of First Failure, May 2017

Dramatic Aerial Video of May 2017 Failure

  • 5 2017 Dredge Pond Failure
    • The extent of the 2017 failure, and how close we came to losing our dredge pond network is clearly illustrated through this aerial footage.

Engineered Plans for the Tulsa Ports Dredge Pond Realignment Project

Click here for Survey Video of Verdigris Riverbanks 2018

Click here for Survey Video of Verdigris Riverbanks 2019

  • Note: This video is post-2019 flood and the dramatic damage and changes from earlier surveys can be seen.

CONTACT

Brian Bigbie

Economic Development, Grants & Special Projects

Phone: 918-202-7707

Mobile: 405-243-8370

Email: brian@tulsaports.com